f.Replace the ceiling tile.

Repeat steps 1 and 2 for each speaker that needs to be installed, connecting the speakers according to the system preferred (for example, in parallel, see page 32).

If you wish to install an optional seismic/ safety cable, at each speaker location do the following:

g.Mark, drill and install a lag eye bolt for the seismic safety cables (not included) in the structural ceiling above the speaker location.

h.Pass the seismic cable through the anchor ring, down to the seismic tab and twist the end around the cable five times. Pass the other end up through the lag eye bolt and twist it around the cable five times.

To wire the speaker, see page 32.

Anchor this end to a lag eye bolt screwed into the structural ceiling.

Route the safety cable through the anchor ring and the seismic tab.

Seismic Safety

Cable

M Attach safety cable

PoleVault IP Systems • Installation — Stage 3 (Speakers)

31

Page 35
Image 35
Extron electronic 305SA manual Attach safety cable