Frymaster FPD, SCFD manual Decathlon Series Gas Fryers, Service Procedures

Models: CFD D SCFD FPD

1 100
Download 100 pages 42.21 Kb
Page 20
Image 20
Manual background

DECATHLON SERIES GAS FRYERS

CHAPTER 1: SERVICE PROCEDURES

1.7.3 Replacing the Temperature Probe; Computer-equipped Fryers (cont.)

6.Remove the appropriate burners to gain access to the temperature probe. (See Steps 20-22 on page 1-27 for more details.)

NOTE: Ensure that the burners are placed in their original spots when putting them back into the fryer. (See page 1-28.)

Remove burners to gain access to temperature probe.

7.Loosen and unscrew the compression nut and the pass-through nut completely from the frypot. Proceed to the next step before removing the probe from the frypot.

8.Remove temperature probe mounting hardware. Some older pots may use a spring-bracket combination. Newer pots use mounting clips. Retain mounting hardware for installation of new temperature probe.

Loosen and unscrew completely the compression nut (bottom arrow), then the pass-through nut (top arrow).

Newer pots have mounting clips.

Older pots have spring-bracket combinations.

1-15

Page 20
Image 20
Frymaster FPD, SCFD manual Decathlon Series Gas Fryers, Service Procedures