128 SPARC Enterprise T5440 Server Service Manual • June 2011
2. Place the IDPROM on an antistatic mat.
Install the IDPROM
Before you begin, complete these tasks:
Read the section, “Safety Information” on page63.
Power off the server, using one of the methods described in the section, “Powering
Off the System” on page67.
“Extend the Server to the Maintenance Position” on page70
“Disconnect Power Cords From the Server” on page68
“Perform Electrostatic Discharge – Antistatic Prevention Measures” on page73
“Remove the Top Cover” on page73
“Remove the Service Processor” on page124