F-60+ Operation and Maintenance ManualOperation

352&(66&21752/&+$57%

Product:____________________

Process: Cold Mount & Laminate (Second Pass)

Date:________________

 

 

 

 

 

 

 

 

FRONT CONTROL SETTINGS

 

 

 

 

 

 

 

 

 

Speed: 0-6 fpm (0-180 cpm)

 

Reverse/Forward: Forward

 

 

 

 

 

 

 

 

 

Roll Pressure: Trial

 

Top Heater: 32-105 °F (0-40

°C)

 

 

 

 

 

 

 

 

Cooling: Off

 

Bottom Heater: 32 °F (0 °C)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

352&(66&21752/',$*5$0%

Cold Mount and Laminate (Second Pass)

NOTE

Use footswitch to load, then accelerate materials through rolls.

Hold

Encapsulated

Image

Release Liner (Peel prior to nip)

OPTIONAL

 

Foam

 

 

 

 

Board

can

be

fed

Core

through

the

pull

 

rolls using

reverse

 

mode.

 

 

 

 

© GBC Pro-Tech 1999 April

3-15

Page 33
Image 33
GBC 930-028 manual 352&66&21752/&+$57%, 352&66&21752/,$*5$0%, Cold Mount and Laminate Second Pass