F-60+ Operation and Maintenance Manual

Operation

 

 

352&(66&21752/&+$57%

Product:___________________

Process: Mount & Hot Overlaminate (Second Pass)

Date:________________

 

 

 

 

 

 

 

 

FRONT CONTROL SETTINGS

 

 

 

 

 

 

 

 

 

Speed : 0-6 fpm (0-180 cpm)

 

Reverse/Forward: Forward

 

 

 

 

 

 

 

 

 

Roll Pressure: Trial

 

Top Heater: 32-105 °F (0-40

°C)

 

 

 

 

 

 

 

 

Cooling: Off

 

Bottom Heater: 32 °F (0 °C)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

352&(66&21752/',$*5$0%

Mount and Hot Overlaminate (Second Pass)

NOTE

Use footswitch to load, then accelerate materials through rolls.

Hold

Encapsulated

Image

 

 

 

Release Liner

 

 

(Peel prior to nip)

OPTIONAL

 

 

 

 

 

 

 

 

 

Board

can be

fed

Foam

through

the

pull

Core

 

 

 

rolls using reverse mode.

© GBC Pro-Tech 1999 April

3-17

Page 35
Image 35
GBC 930-028 manual 352&66&21752/&+$57%, 352&66&21752/,$*5$0%, Mount and Hot Overlaminate Second Pass