CHAPTER 3: INSTALLATION

FIGURE 3–2: ANSI and DIN Mounting Panel Cutouts

3.1.2ANSI Installation Steps

Mount the meter in a dry location free from dirt and corrosive substances. The meter is designed to withstand harsh environmental conditions (see the Environmental specifications in Chapter 2 for additional details).

Use the following steps to install the meter:

ZInsert the four threaded rods by hand into the back of the meter. Twist until secure.

ZSlide the ANSI 12 mounting gasket onto the back of the meter with the rods in place.

ZSlide the meter with the mounting gasket into the panel.

ZSecure from the back of the panel with a lock washer and nut on each threaded rod.

Use a small wrench to tighten – do not overtighten.

3–2

EPM 6000 MULTI-FUNCTION POWER METERING SYSTEM – USER GUIDE

Page 34
Image 34
GE EPM 6000 Multi-function Power Metering System Ansi Installation Steps, Ansi and DIN Mounting Panel Cutouts