INSTALLATION CONSIDERATIONS

3-5

 

CT LEADS TERMINATED TO METER

3-6

 

CT LEADS PASS-THROUGH(NO METER TERMINATION)

3-6

 

QUICK CONNECT CRIMP CT TERMINATIONS

3-7

 

VOLTAGE AND POWER SUPPLY CONNECTIONS

3-7

 

GROUND CONNECTIONS

3-8

 

WIRING DIAGRAMS

3-9

 

DESCRIPTION

3-9

 

WYE, 4-WIRE WITH NO PTS AND 3 CTS, 3 ELEMENT

3-10

 

WYE, 4-WIRE WITH NO PTS AND 3 CTS, 2.5 ELEMENT

3-11

 

WYE, 4-WIRE WITH 3 PTS AND 3 CTS, 3 ELEMENT

3-12

 

WYE, 4-WIRE WITH 2 PTS AND 3 CTS, 2.5 ELEMENT

3-13

 

DELTA, 3-WIRE WITH NO PTS AND 2 CTS

3-14

 

DELTA, 3-WIRE WITH 2 PTS AND 2 CTS

3-15

 

CURRENT-ONLYMEASUREMENT (THREE-PHASE)

3-16

 

CURRENT-ONLYMEASUREMENT (DUAL-PHASE)

3-17

 

CURRENT-ONLYMEASUREMENT (SINGLE-PHASE)

3-18

 

COMMUNICATIONS SETUP

3-19

 

DESCRIPTION

3-19

 

IRDA COM1 PORT

3-19

 

RS485 COM2 PORT

3-19

 

 

 

4: USING THE METER

FRONT PANEL INTERFACE

4-1

 

DESCRIPTION

4-1

 

FACEPLATE ELEMENTS

4-1

 

FACEPLATE BUTTONS

4-2

 

PERCENTAGE OF LOAD BAR

4-3

 

WATT-HOURACCURACY TESTING (VERIFICATION)

4-4

 

CONFIGURING THE METER VIA THE FRONT PANEL

4-5

 

OVERVIEW

4-5

 

START UP

4-5

 

MAIN MENU

4-6

 

RESET MODE AND PASSWORD ENTRY

4-6

 

CHANGING SETTINGS IN CONFIGURATION MODE

4-9

 

DESCRIPTION

4-9

 

CONFIGURING THE SCROLL FEATURE

4-9

 

PROGRAMMING THE CONFIGURATION MODE SCREENS

4-10

 

CONFIGURING THE CT SETTING

4-11

 

CONFIGURING THE PT SETTING

4-12

 

CONFIGURING THE CONNECTION SETTING

4-13

 

CONFIGURING THE COMMUNICATION PORT SETTING

4-14

 

OPERATING MODE

4-17

 

DESCRIPTION

4-17

 

 

 

5: COMMUNICATIONS

MODBUS COMMUNICATIONS

5-1

 

MEMORY MAP DESCRIPTION

5-1

 

MEMORY MAP

5-1

 

MODBUS MEMORY MAP NOTES

5-7

 

MODBUS MEMORY MAP DATA FORMATS

5-9

 

DNP POINT MAPPING

5-10

 

DNP POINT MAPS

5-10

 

DNP POINT MAP NOTES

5-12

TOC–2

EPM 6000 MULTI-FUNCTION POWER METERING SYSTEM – USER GUIDE

Page 4
Image 4
GE EPM 6000 Multi-function Power Metering System instruction manual Using the Meter