GE LM10 Specifications, Protection Elements, Metering, Overcurrent Ansi, Ground Fault, Stall

Models: LM10 Motor Protection System

1 106
Download 106 pages 52.19 Kb
Page 13
Image 13
Specifications

CHAPTER 1: INTRODUCTIONSPECIFICATIONS

1.5

Specifications

 

 

1.5.1 Protection Elements

 

 

OVERCURRENT (ANSI 51)

 

 

Curve shapes:

NEMA class 10, 15, 20 and 30, hot and cold

 

Timing accuracy:

±5% of total trip time + 1 second

 

GROUND FAULT

 

 

Pickup level:

0.4 to 20.0 A in steps of 0.2

 

Pickup accuracy:

±5% or ±0.1 A, whichever is greater

 

Time delay:

0 to 2.5 seconds in steps of 0.1

 

Timing accuracy:

±200 ms

 

CURRENT UNBALANCE (ANSI 46)

 

 

Pickup level:

2 to 25% in steps of 1

 

Pickup accuracy:

±5%

 

Time delay:

0 to 255 seconds in steps of 1

 

Timing accuracy:

±5% of total trip time + 1 second

 

MECHANICAL JAM

 

 

Pickup level:

100 to 250% in steps of 1

 

Pickup Accuracy:

±5%

 

Time delay:

0 to 1000 seconds in steps of 5

 

Timing accuracy:

±5% of total trip time + 1 second

 

STALL

 

 

Pickup level:

330 to 600% in steps of 5

 

Pickup Accuracy:

±5%

 

Time delay:

0 to 30.0 seconds in steps of 0.5

 

Timing accuracy:

±5% of total trip time + 1 second

 

LOAD LOSS

 

 

Pickup level:

15 to 100% in steps of 1

 

Pickup Accuracy:

±5%

 

Time delay:

0 to 255 seconds in steps of 1

 

Timing accuracy:

±5% of total trip time + 1 second

UNDERVOLTAGE/OVERVOLTAGE

Undervoltage pickup level: 80% of nominal voltage (96 V)

Overvoltage pickup level: 117% of nominal voltage (140 V)

Pickup accuracy:

±5%

Trip time:

0.5 second

Timing accuracy:

±200 ms

1.5.2Metering

PHASE CURRENT

Resolution:

0.1 A

Range:

0.05 to 8 × CT Primary (3200.0 A max.)

Accuracy:

±5% of full scale

LM10 MOTOR PROTECTION SYSTEM – INSTRUCTION MANUAL

1–7

Page 13
Image 13
GE LM10 Specifications, Protection Elements, Metering, Overcurrent Ansi, Ground Fault, Mechanical Jam, Stall, Load Loss