
Recommended
Adjustments
For your convenience, the adjustments listed below have been performed at the factory and no further setup is required to operate your machine.
However, because of the many variables involved with shipping and storage, some of these adjust- ments may need to be repeated to ensure opti- mum cutting results. Keep this in mind as you start to use your new jointer/planer.
1.Jointer Table Parallelism (Page 39)
2.Depth Scale Calibration (Page 46)
3.Fence Stop Accuracy (Page 47)
4.Planer Table Parallelism (Page 50)
5.Feed Roller Spring Tension (Page 51)
G0633/G0634 Jointer/Planer Combo Machine
Tighten V-Belts
The final step in the setup process must be done after approximately 16 hours of operation. During this first 16 hours, the
Note: Pulleys and belts can get hot. This is a nor- mal condition. Allow them to cool before making adjustments.
A small amount of black belt dust at the bottom of the belt housing is normal during the life of the machine and does not indicate premature belt failure is in progress.