4 | Getting Started | Installer Guide |
|
|
A. Typical Appliance System
NOTICE: Illustrations and photos reflect typical installations and are for design purposes only. Illustrations/diagrams are not drawn to scale. Actual product may vary from pictures in manual
VERTICAL TERMINATION CAP (SECTION 10.F. )
MAINTAINS MINIMUM CLEARANCE
AROUND PIPE (SECTION 10.E.)
VENT PIPE (SECTION 8)
CEILING FIRESTOP ON FLOOR OF ATTIC (SECTION 8.C.)
HORIZONTAL TERMINATION CAP (SECTION 10.H.)
FRAMING/HEADER (SECTION 5)
GAS LINE (SECTION 11)
Figure 4.1 Typical Appliance System
NOTE: An installation will have either a vertical termination or a horizontal termination. It will not have both (as shown).
STORM COLLAR (SECTION 10.E. )
VENT PIPE PENETRATES ROOF
PREFERABLY WITHOUT AFFECTING
ROOF RAFTERS
ATTIC INSULATION SHIELD (NOT SHOWN) MUST BE USED HERE TO KEEP INSULATION AWAY FROM VENT PIPE IF ATTIC IS INSULATED (SECTION 8.E.)
FRAMING HEADED OFF IN CEILING JOISTS (SECTION 8.C.)
OPTIONAL
WALL SWITCH (Section 12.G.)
MANTEL AND MANTEL LEG (SECTION 5.D. & 13.A.)
SURROUND (SECTION 14.M.)
HEARTH EXTENSION (Section 13.E.)