3 Framing and Clearances
Note:
•Illustrations reflect typical installations and are FOR DESIGN PURPOSES ONLY.
•Illustrations/diagrams are not drawn to scale.
•Actual installation may vary due to individual design preference.
A.Selecting Appliance Location
When selecting a location for your appliance it is important to consider the required clearances to walls (see figure 3.1).
WARNING
Fire Risk
Provide adequate clearance:
•Around air openings
•To combustibles
• For service access
Locate appliance away from traffic areas.
NOTE: For actual appliance dimensions refer to Sec- tion 16.
B. Mantel Projections
A Studio front is required for all installs. No mantels are allowed when using Studio fronts.
1/2 IN.
A
E
A
B
C
TOP VENT,
ONE 90º ELBOW
B
ALCOVE
INSTALLATION
D
| A | B | C | D | E |
Inches | 12 | ||||
|
|
|
|
|
|
Millimeters | 841 | 740 | 1187 | 892 | 305 |
In addition to these framing dimensions, also reference the following sections:
•Clearances and Mantel Projections (Section 3B).
•Vent Clearances and Framing (Section 6).
Figure 3.1 Appliance Locations
Heat & Glo • Soho24B • | 7 |