3 Framing and Clearances

Note:

Illustrations reflect typical installations and are FOR DESIGN PURPOSES ONLY.

Illustrations/diagrams are not drawn to scale.

Actual installation may vary due to individual design preference.

A.Selecting Appliance Location

When selecting a location for your appliance it is important to consider the required clearances to walls (see figure 3.1).

WARNING

Fire Risk

Provide adequate clearance:

Around air openings

To combustibles

• For service access

Locate appliance away from traffic areas.

NOTE: For actual appliance dimensions refer to Sec- tion 16.

B. Mantel Projections

A Studio front is required for all installs. No mantels are allowed when using Studio fronts.

1/2 IN.

A

E

A

B

C

TOP VENT,

ONE 90º ELBOW

B

ALCOVE

INSTALLATION

D

 

A

B

C

D

E

Inches

33-1/8

29-1/8

46-3/4

35-1/8

12

 

 

 

 

 

 

Millimeters

841

740

1187

892

305

In addition to these framing dimensions, also reference the following sections:

Clearances and Mantel Projections (Section 3B).

Vent Clearances and Framing (Section 6).

Figure 3.1 Appliance Locations

Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12

7

Page 7
Image 7
Heat & Glo LifeStyle 2137-900 owner manual Framing and Clearances, Selecting Appliance Location, Mantel Projections