Heat & Glo LifeStyle 2137-900 Appliance Preparation, A. Top Vent, Elbow Heat Shield, Rope Ring

Models: 2137-900

1 55
Download 55 pages 24.88 Kb
Page 19
Image 19
7 Appliance Preparation

7 Appliance Preparation

A. Top Vent

CAUTION

Sharp Edges

Wear protective gloves and safety glasses during installation.

ELBOW HEAT SHIELD

Figure 7.1

An elbow heat shield is attached to the Soho24B. Do not remove this heat shield.

A. Top VentSUPPORT TAB

ROPE RING

Figure 7.2

If venting with a 90 degree elbow directly off of the top of the unit, the heat shield should be placed as shown. Ro- tate the heat shield up to the vertical position and fold the tab down to contact the elbow. Make sure the rope ring, found in the manual bag, is in place around the elbow before attaching more pipe.

Figure 7.3

This is a view from the front of the unit when the elbow heat shield is properly in place.

ROPE RING

Figure 7.4

If venting vertically or using vertical pipe before the elbow, rotate the elbow heat shield to a vertical position and fold the heat shield in half as shown. Make sure the rope ring, found in the manual bag, is in place around the first sec-

tion of vent pipe.

Figure 7.5

This is a view from the front of the unit when not using an 90 degree elbow directly off the top of the unit.

Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12

19

Page 19
Image 19
Heat & Glo LifeStyle 2137-900 owner manual Appliance Preparation, A. Top Vent, Elbow Heat Shield, Support Tab Rope Ring

FAQ

What safety precautions should I take during installation?

Wear protective gloves and safety glasses when handling sharp edges during installation.

Should I remove the elbow heat shield?

Do not remove the elbow heat shield. Refer to Figure 7.1 for proper installation.

How should I place the heat shield for venting with a 90-degree elbow?

Rotate the heat shield to the vertical position and fold the tab down to contact the elbow, as shown in Figure 7.2. Ensure the rope ring is in place before attaching more pipe.