Heat & Glo LifeStyle 2137-900 Termination Locations, A. Vent Termination Minimum Clearances

Models: 2137-900

1 55
Download 55 pages 24.88 Kb
Page 9
Image 9
4 Termination Locations

4 Termination Locations

A. Vent Termination Minimum Clearances

HORIZONTAL OVERHANG

A. Vent Termination Minimum Clearances WARNING

Fire Risk. Explosion Risk.

Maintain vent clearance to combustibles as specified.

Do not pack air space with insulation or other materials.

Failure to keep insulation or other materials away from vent pipe may cause fire.

2FT.

MIN.

GAS DIRECT VENT

TERMINATION CAP

20 INCHES MIN.

VERTICAL

LOWEST

WALL

 

DISCHARGE

 

OPENING

 

X

12

(See Figure 4.4 for specific clearances) ROOF PITCH

IS X/ 12

H (MIN.) - MINIMUM HEIGHT FROM ROOF TO LOWEST DISCHARGE OPENING

Measure vertical clearances from this surface.

Measure horizontal clearances from this surface.

(See Figure 4.4 for specific clearances)

Figure 4.1

Roof Pitch

H (Min.) Ft.

Flat to 6/12

1.0*

Over 6/12 to 7/12

1.25*

Over 7/12 to 8/12

1.5*

Over 8/12 to 9/12

2.0*

Over 9/12 to 10/12

2.5

Over 10/12 to 11/12

3.25

Over 11/12 to 12/12

4.0

Over 12/12 to 14/12

5.0

Over 14/12 to 16/12

6.0

Over 16/12 to 18/12

7.0

Over 18/12 to 20/12

7.5

Over 20/12 to 21/12

8.0

* 3 foot minimum in snow regions

Figure 4.2 Minimum height from roof to lowest discharge opening

Figure 4.2 specifies minimum vent heights for various pitched roofs.

A

B

6 in. (minimum) up to 20 in.

18 in. minimum

152 mm/508 mm

457 mm

20 in. and over

0 in. minimum

Gas, Wood or Fuel Oil

Termination Cap

B

A *

Gas

Termination

Cap **

*If using decorative cap cover(s), this distance may need to be increased. Refer to the installation instructions supplied with the decorative cap cover.

**In a staggered installation with both gas and wood or fuel oil terminations, the wood or fuel oil termination cap must be higher than the gas termination cap.

Figure 4.3 Multiple Vertical Termination

Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12

9

Page 9
Image 9
Heat & Glo LifeStyle 2137-900 Termination Locations, A. Vent Termination Minimum Clearances, See .4 for specific clearances

FAQ

What are the minimum clearances for vent termination?

The minimum clearance for gas direct vent termination cap is 20 inches vertically and 2 feet horizontally from the wall.

What are the minimum height specifications for various pitched roofs?

The minimum vent heights for pitched roofs range from 1.0 to 8.0 feet, with additional minimums in snow regions.

How should I handle staggered installations with gas and wood/fuel oil terminations?

In staggered installations, the wood/fuel oil termination cap must be higher than the gas termination cap. Refer to installation instructions for decorative cap covers.