Image 33
Table 9b: Unit Operation

T h e Q u a l i t y L e a d e r i n C o n d i t i o n i n g A i r

R e s i d e n t i a l S p l i t - 6 0 H z R 2 2 & R 4 1 0 A

R e v. : 5 J u n e , 2 0 0 8

CXM Controls

CXM Control Start-up Operation

The control will not operate until all inputs and safety controls are checked for normal conditions. The compressor will have a 5 minute anti-short cycle delay at power-up. The first time after power-up that there is a call for compressor, the compressor will follow a 5 to 80 second random start delay. After the random start delay and anti-short cycle delay, the compressor relay will be energized. On all subsequent compressor calls, the random start delay is omitted.

Table 9b: Unit Operation

T-stat signal

HTS

HSS

HSS

Variable Speed

Variable Speed

PSC Air Handler

 

Air Handler

Air Handler

 

G

Fan only

Fan only

Fan only

 

 

 

 

G, Y or Y1

Stage 1 heating1

Stage 1 heating3

Stage 1 heating5

G, Y1, Y2

Stage 2 heating1

Stage 2 heating3

Stage 2 heating5

G, Y1, Y2, W

Stage 3 heating1

Stage 3 heating3

N/A

G, W

Emergency heat

Emergency heat

Emergency heat

 

 

 

 

G, Y or Y1, O

Stage 1 cooling2

Stage 1 cooling4

Cooling6

G, Y1, Y2, O

Stage 2 cooling2

Stage 2 cooling4

N/A

1Stage 1 = 1st stage compressor, 1st stage fan operation Stage 2 = 2nd stage compressor, 2nd stage fan operation Stage 3 = 2nd stage compressor, auxiliary electric heat, 2nd

or 3rd stage fan operation (depending on fan settings)

2Stage 1 = 1st stage compressor, 1st stage fan operation, reversing valve

Stage 2 = 2nd stage compressor, 2nd stage fan operation, reversing valve

3Stage 1 = compressor, 1st stage fan operation Stage 2 = compressor, 2nd stage fan operation

Stage 3 = compressor, auxiliary electric heat, 2nd or 3rd stage fan operation (depending on fan settings)

4Stage 1 = compressor, 1st stage fan operation, reversing valve Stage 2 = compressor, 2nd stage fan operation, reversing valve

5Stage 1 = compressor, fan

Stage 2 = compressor, auxiliary electric heat, fan

6Cooling = compressor, fan, reversing valve

w w w. h e a t c o n t o l l e r. c o m