HP 2100 ER manual Fibre Bridge Connection, Basic Configuration, DLT and MO Libraries

Models: 2100 ER

1 95
Download 95 pages 27.29 Kb
Page 31
Image 31

 

 

Setting Up the Fibre Bridge

 

 

Installing Cables

 

3.

Connect one end of the optical cable into the GBIC on the Fibre

 

 

Bridge and the other end into the GBIC on the Fibre Channel HBA in

 

 

the host.

 

4.

Connect the power cord from the Fibre Bridge to an grounded outlet.

 

5.

Confirm that all cable ends are connected securely and both ends of

 

 

the SCSI bus are properly terminated, as shown in Figure 2-3 on page

 

 

2-7.

 

6.

Go to “Powering on the System” in Chapter 3.

Figure 2-3

Fibre Bridge Connection, Basic Configuration

 

(DLT and MO Libraries)

Setting Up the Fibre Bridge

Chapter 2

2-7

Page 31
Image 31
HP 2100 ER manual Fibre Bridge Connection, Basic Configuration, DLT and MO Libraries