Chapter 2. Installing options

This chapter provides basic instructions for installing hardware options in the server. These instructions are intended for users who are experienced with setting up IBM server hardware. If you need more detailed instructions, see the User’s Guide on the IBM xSeries Documentation CD.

Installation guidelines

Before you install options, read the following information:

vRead the safety information that begins on page v, the guidelines in “Working inside the server with the power on” on page 8, and “Handling static-sensitive devices” on page 9. This information will help you work safely.

vObserve good housekeeping in the area where you are working. Place removed covers and other parts in a safe place.

vIf you must start the server while the cover is removed, make sure that no one is near the server and that no tools or other objects have been left inside the server.

vDo not attempt to lift an object that you think is too heavy for you. If you have to lift a heavy object, observe the following precautions:

Make sure that you can stand safely without slipping.

Distribute the weight of the object equally between your feet.

Use a slow lifting force. Never move suddenly or twist when you lift a heavy object.

To avoid straining the muscles in your back, lift by standing or by pushing up with your leg muscles.

vMake sure that you have an adequate number of properly grounded electrical outlets for the server, monitor, and other devices.

vBack up all important data before you make changes to disk drives.

vHave a small flat-blade screwdriver available.

vYou do not have to turn off the server to install or replace hot-swap power supplies, hot-swap fans, or hot-plug Universal Serial Bus (USB) devices.

vBlue on a component indicates touch points, where you can grip the component to remove it from or install it in the server, open or close a latch, and so on.

vOrange on a component or an orange label on or near a component indicates that the component can be hot-swapped, which means that if the server and operating system support hot-swap capability, you can remove or install the component while the server is running. (Orange can also indicate touch points on hot-swap components.) See the instructions for removing and installing a specific hot-swap component for any additional procedures that you might have to perform before you remove or install the component.

vWhen you have to access the inside of the server, you might find it easier to lay the server on its side. Before laying the server on its side, rotate the two front stabilizing feet a quarter turn inward toward the server, so that they do not break. Before returning the server to an upright position, rotate the front stabilizing feet a quarter turn outward from the server.

vWhen you are finished working on the server, reinstall all safety shields, guards, labels, and ground wires.

vFor a list of supported options for the server, see http://www.ibm.com/servers/ eserver/serverproven/compat/us/.

© Copyright IBM Corp. 2006

7

Page 21
Image 21
IBM 8490, 8485 manual Installing options, Installation guidelines