8. Disconnect the three inverter cables to gain access to the system board shielding.
9.Open the system board shielding by removing the five screws to the main bracket.
1
that secure the system board shielding
Closing the system board shielding
To close the system board shielding, do the following:
1.Close the system board shielding by installing the five screws to the main bracket.
1
that secure the system board shielding