50 & 60Hz user manual Liebert Mini-Mate2, UserManual -8 Tons,50& 60Hz, Precision Cooling
Models:
50 & 60Hz
8 Tons
1
1
72
72
Download
72 pages
64 Kb
1
2
3
4
5
6
7
8
<
>
Troubleshooting
Install
Refrigerant piping diagram
Replacement Procedures
Dimension
Maintenance
System configurations-aircooled systems
5.1.5Humidifier Problem Alarm
3.18Run Diagnostics
3.10Setup Operation
Page 1
Image 1
Pr
e
ci
s
io
n
C
o
o
li
n
g
Fo
r
B
u
si
n
es
s
-C
r
iti
c
al
C
o
n
tinuit
y
™
Li
e
be
r
t
M
i
n
i-
M
a
t
e
2
™
Us
e
r
M
a
n
u
a
l -
8 T
ons,
5
0
& 6
0
Hz
Page 2
Page 1
Image 1
Page 2
Contents
UserManual -8 Tons,50& 60Hz
Liebert Mini-Mate2
Precision Cooling
For Business-CriticalContinuity
Page
TABLE OF CONTENTS
3.0 MICROPROCESSOR CONTROL
5.0 ALARMS
TABLES
FIGURES
Table iii Heat rejection matchup - 60 Hz
MODEL NUMBER NOMENCLATURE
Table iv Heat rejection matchup - 50 Hz
Page
1.1.1Controls
1.0PRODUCT FEATURES
Chilled-WaterModel
1.1.3Condensing Unit Components
1.2.2Electric Reheat
1.2.1Canister Humidifier
1.2.3SCR Electric Reheat
1.2.4Hot Gas Bypass Condensing Units
1.3.2Refrigerant Line Sweat Adapter Kits
1.3.1Single Point Power Kit
1.3.3Return Air Filter Box with Duct Collar Kit
1.3.4Condensate Pump Kit
2.0SITE PREPARATION AND INSTALLATION
2.1Installation Considerations
2.1.1Room Preparation
2.1.2Location Considerations
Site Preparation and Installation
Site Preparation and Installation
Figure 1 System configurations-aircooled systems
Evaporator
Evaporator
Unit weights
2.2System Weights
2.3Equipment Inspection upon receipt
Evaporator
2. Use the Nylock nuts to “jam” the plain nuts
Figure 5 Close coupled installation
2.4.1Close Coupled Installations
2.4.2Evaporator Air Distribution Filter Box
Site Preparation and Installation
Connections for Ducted Systems
Site Preparation and Installation
Figure 6 Drain installation
Condensate Pump
Figure 7 Condensate pump installation
Humidifier Water Supply Line
AIR INLET
DPN000236 Rev0
Chilled-Water Piping-Chilled-waterSystems Only
Refrigerant R-22Piping
Figure 9 Refrigerant piping diagram
Recommended refrigerant line sizes
Quick Connect Fittings
Total refrigerant = Units and Lines
Table 7 8-tonunit refrigerant charge
Line charges field piping
DPN000240 Rev0
OPTIONAL FILTER BOX
FRONT OF UNIT
Power Connections
Evaporator unit electrical connections
Site Preparation and Installation
2.5.1Location Considerations
Site Preparation and Installation
2.5.2Ducting
General Considerations
Site Preparation and Installation
Power Connections
2.5.3Piping Connections
2.5.4Electrical Connections - Condensing Unit
DPN000248 Rev1
Heat rejection connection.Field
Site Preparation and Installation
2.6.1Location Considerations
Power Connections
2.6.2Piping Connections
2.6.3Electrical Connections
DPN000135 Rev0
Electric service connection
High voltage
Low voltage
Site Preparation and Installation
FOOTPRINT DIMENSIONS
DPN000131 Rev0
SL-11081Page7
Site Preparation and Installation
2.7.2Piping Connections
2.7.1Location Considerations
Water/Glycol Piping Considerations
Condensing Unit Fluid Requirements
Site Preparation and Installation
Site Preparation and Installation
Two circuits provided. Single circuit shown
Site Preparation and Installation
SL-11088Pg7
2.8.1Free-CoolingCoil GLYCOOL
2.8Optional Equipment Piping
Site Preparation and Installation
2.9Checklist for Completed Installation
3.0MICROPROCESSOR CONTROL
3.1Feature Overview
Figure 23 Wall box
3.2Main Menu Menu
3.6Alarm History
3.5Active Alarms
Table 10 Default setpoints and allowable ranges
3.3Setpoints
3.10.1Restart Time Delay
3.10Setup Operation
3.7Time
3.8Date
3.10.2C/F Degrees
3.10.5Show DIP Switch
3.10.3Humidity Control Method
3.10.4Lead Compressor
3.13Alarm Enable
3.11Change Passwords
3.12Calibrate Sensors
3.15Common Alarm Enable
3.14Alarm Time Delay
3.16Custom Alarms
Table 13 Alarm default time delays
Table 15 Switch settings wallbox board
Equipment Options Switches
3.17Custom Text
LCD Display Contrast
Test Outputs
3.18Run Diagnostics
Test Inputs
Fan turned on with all loads
Figure 24 Control menu
Test Micro
Microprocessor Control
Page
4.2.2Chilled-WaterCooling 8 Ton
4.0SYSTEM PERFORMANCE MICROPROCESSOR CONTROLS
4.2.3GLYCOOL Cooling 8 Ton
4.3.1Electric Reheat - Staged
4.6Communications
4.5Load Control Features
4.4.2Humidification Operation System Activation
4.4.3Dehumidification Lockout
5.1.1Custom Alarms
5.0ALARMS
5.1.2High Head Pressure
Air-CooledSystems
5.1.5Humidifier Problem Alarm
5.1.4Temperature
5.1.6High-WaterAlarm
5.1.7Loss of Power
5.2.1Change Filter
5.2Optional/Custom Alarms
5.2.2Firestat
5.2.3Smoke Detector
6.1.1Environmental Control Functions
6.0SYSTEM OPERATION, TESTING, AND MAINTENANCE
6.1.2Cooling
6.1.3Heating
6.2.2Filters
6.2.1Electric Panel
6.2.3Blower System
Air Distribution
6.2.5Refrigeration System
6.2.4Electric Reheat
Suction Pressure
Discharge Pressure
Adjustment
Glycol Solution Maintenance
Regulating Valves Water/Glycol Condensing Units
Hot Gas Bypass Optional
Replacement Procedures
System Operation, Testing, and Maintenance
Replacing the Humidifier Canister
6.2.7Circuit Board Adjustments
FILTERS
7.0MAINTENANCE INSPECTION CHECKLIST
BLOWER SECTION
REHEAT
Table 18 Troubleshooting
8.0TROUBLESHOOTING
Troubleshooting
Troubleshooting
Table 18 Troubleshooting continued
Troubleshooting
Troubleshooting
Troubleshooting
Page