Manuals
/
Liebert
/
Household Appliance
/
Humidifier
Liebert
8 Tons, 50 & 60Hz
user manual
Troubleshooting
Models:
50 & 60Hz
8 Tons
1
68
72
72
Download
72 pages
64 Kb
65
66
67
68
69
70
71
72
Troubleshooting
Install
Alarms
Password
Alarm default time delays
Restart Time Delay
Dimension
Maintenance
Humidifier Problem Alarm
Run Diagnostics
Page 68
Image 68
Troubleshooting
NOTES
60
Page 67
Page 69
Page 68
Image 68
Page 67
Page 69
Contents
Liebert Mini-Mate2
Page
Table of Contents
Microprocessor Control
System Performance Microprocessor Controls
Alarms
System OPERATION, TESTING, and Maintenance
Figures
Table iii Heat rejection matchup 60 Hz
Table iv Heat rejection matchup 50 Hz
Page
Standard Product Features
Optional Equipment
Ancillary Ship Loose Accessories
Installation Considerations
Input Voltage Entering Fluid Temperature Min
Room Preparation
Application limits, evaporator and chilled-water units
Location Considerations
Drycooler Evaporator
Equipment Inspection upon receipt
System Weights
Unit weights
Locking nut Hex nut
Installing the Evaporator or Chilled-Water Units
Nylock
Close Coupled Installations
Nut Clamps are for shipping purposes only
Evaporator Air Distribution Filter Box
Connections for Ducted Systems
Evaporator external static pressure 60 at 3750 CFM 6371 CMH
Hp Motor std Hp Motor opt Turns External Open
Drain installation
Piping Connections and Coolant Requirements Drain Line
Condensate Pump
Humidifier Water Supply Line
General arrangement diagram chilled-water systems
Chilled-Water Piping-Chilled-water Systems Only
Equivalent Suction Feet Circuit Liquid Line
Refrigerant R-22 Piping
Recommended refrigerant line sizes
Total refrigerant = Units and Lines
Quick Connect Fittings
Ton unit refrigerant charge
Line charges field piping
Optional Filter BOX
Power Connections
Electrical Connections, Evaporator or Chilled-Water Unit
Evaporator unit electrical connections
Front of Unit
Considerations for Specific Applications
Ducting
General Considerations
Control Connections
Piping Connections
Electrical Connections Condensing Unit
DPN000248Rev1
Heat rejection connection. Field
Outdoor Air-Cooled Condensing Unit Installation
Electrical Connections
Electric service connection
High voltage
Low voltage
Earth ground connection
Footprint Dimensions
292
11-1/2
152
Regulating Valve
Water/Glycol Piping Considerations
Condensing Unit Fluid Requirements
Indoor water/glycol condensing unit dimensional data
Site Preparation and Installation
Two circuits provided. Single circuit shown
Optional Equipment Piping
Optional free cooling coil 3-way valve on water/glycol units
Optional free cooling coil 3-way valve on air-cooled units
Checklist for Completed Installation
Feature Overview
Wall box
Main Menu Menu
Active Alarms
Alarm History
Default setpoints and allowable ranges
Setpoints
Setup Operation
Restart Time Delay
Time
Date
Show DIP Switch
10.2 C/F Degrees
Humidity Control Method
Lead Compressor
Change Passwords
Alarm Enable
Setup functions, default values and allowable ranges
Calibrate Sensors
Alarm Time Delay
Common Alarm Enable
Custom Alarms
Alarm default time delays
Equipment Options Switches
Custom Text
LCD Display Contrast
Nonvolatile Memory
Test Inputs
Run Diagnostics
Test Outputs
Test Micro
TB3-1 TB3-2 TB3-3 TB4-4 Wall Box DIP Switches
TB3-4 Connection to Terminal #4 Wallbox
TB3-3 Connection to Terminal #3 Wallbox
TB3-2 Connection to Terminal #2 Wallbox
Reheat
Control Type Response Proportional Control
Cooling
Load Control Features
Dehumidification / Humidification Percent Required
Communications
Humidification Operation System Activation
Alarms Definitions and Troubleshooting
Custom Alarms
High Head Pressure
Air-Cooled Systems
Temperature
Humidifier Problem Alarm
High-Water Alarm
Loss of Power
Optional/Custom Alarms
Change Filter
System Testing
Maintenance and Component Operation
Refrigeration System
Suction Pressure
Discharge Pressure
Thermostatic Expansion Valve
Hot Gas Bypass Optional
Glycol Solution Maintenance
Regulating Valves Water/Glycol Condensing Units
Replacement Procedures
Steam Generating Humidifier Operation Procedures
Circuit Board Adjustments
Humidifier control board DIP switch settings
Replacing the Humidifier Canister
Amps
Maintenance Inspection Checklist
Troubleshooting
Symptom Possible Cause Check or Remedy Cooling cycle too
Short
Display freezes
Control pads
Troubleshooting
Troubleshooting
Troubleshooting
Page
Net
Iti
Tin
That
Top
Page
Image
Contents