Lincoln Electric SVM144-B service manual Figure F.7 Location Leads X2

Models: SVM144-B

1 108
Download 108 pages 13.35 Kb
Page 63
Image 63

TOC

F-25

TROUBLESHOOTING & REPAIR

F-25

ACTIVE SCR RECTIFIER ASSEMBLY TEST (continued)

6.Disconnect leads X2 and X3 (braided copper strap) from the negative capaci- tor bank buss bar using a 1/2 in. open end wrench. See Figure F.7.

FIGURE F.7 — LOCATION OF

LEADS X2 AND X3.

NEGATIVE

CAPACITOR

BANK BUSS

BAR

8.Use a commercial SCR tester or con- struct the tester circuit shown in Figure F.8. One 6-volt lantern battery can be used. R1 and R2 resistor values are ±10%. Set voltmeter scale low, at approximately 0-5 volts or 5-10 volts.

a.Test the voltage level of the battery. Short leads (A) and (C). Close switch SW-1. Battery voltage should be 4.5 volts or higher. If lower, replace the battery.

FIGURE F.8 — SCR TESTER CIRCUIT

AND SCR CONNECTIONS.

Return to

Return to Section TOC

Return to Section TOC

Return to

Return to Master TOC

Return to Master TOC

LEADS X2 AND X3

CONNECTION

7. Separate leads X2 and X3 from the negative capacitor bank buss bar. Be sure there is no electrical contact.

NOTE: DO NOT DISASSEMBLE THE SCR

RECTIFIER HEAT SINK ASSEMBLY.

POWER MIG 255

Page 63
Image 63
Lincoln Electric SVM144-B service manual Figure F.7 Location Leads X2