Lochinvar 1.5, 3.5, 2.5 service manual Troubleshooting, Fault, Description, Corrective Action

Models: 3.5 2.5 1.5

1 56
Download 56 pages 20.39 Kb
Page 50
Image 50
Manual background

Service Manual

3 Troubleshooting

Table 3G (continued from previous page) Troubleshooting Chart - Fault Messages Displayed on Boiler Interface

FAULT

DESCRIPTION

CORRECTIVE ACTION

 

 

 

 

 

 

Too Many

Too many manual resets have occurred

• Wait 15 minutes and try again.

 

 

• Turn power off to unit, wait 30 seconds and then turn

Resets - Try Later

during a 15 minute period.

 

 

power back on.

 

 

 

 

 

 

 

 

Internal Fault

The main control board has detected an

• Replace the main control board.

 

 

internal fault.

 

 

 

 

 

 

 

 

 

 

Writing to

The main control board has detected an

• Replace the main control board.

 

 

Memos

internal fault.

 

 

 

 

 

 

 

 

 

 

• Inspect the heat exchanger. Reference page 35 of

 

 

this manual for the procedure on how to clean the

 

 

flue side of the heat exchanger.

 

 

Flue Temp

 

• Inspect the flue sensor and associated wiring.

The stack temperature has exceeded the

Measure

the resistance of

the flue

sensor and

Shutdown

compare to Table 3E on page 38 of this manual.

set parameters for the boiler.

 

Replace the sensor if necessary.

 

 

 

 

 

 

 

 

• Verify that the vent/air intake pipes are properly

 

 

installed and that there are no obstructions.

 

 

 

• Replace the main control board.

 

 

 

 

 

 

 

• Verify that the system is full of water and that all air

 

 

has been properly purged from the system.

 

 

 

• Verify that the boiler is piped properly into the heating

 

 

system. Refer to Section 5 - Hydronic Piping of the

 

 

Crest

Installation and

Operation

Manual

 

 

for the proper piping methods for the Crest boiler.

 

 

• Check for voltage to the boiler pump motor on a call

Delta T

The temperature rise across the heat

for heat. If voltage is not present, check the wiring

back to the pump relay. Replace the pump relay if

Shutdown

exchanger has exceeded the set parameters

necessary.

 

 

 

 

for the boiler.

 

 

 

 

• If 120 VAC is present on a call for heat and the boiler

 

 

 

 

pump is not operating, replace the pump.

 

 

 

• Verify that the boiler pump is set to the proper speed

 

 

or that the pump is the proper size. Reference

 

 

Section 5 - Hydronic Piping of the Crest

 

 

Installation and Operation

Manual

for

boiler

 

 

pump specifications.

 

 

 

 

 

 

 

 

 

 

Manual background 50 Manual background

Page 50
Image 50
Lochinvar 1.5, 3.5, 2.5 service manual Troubleshooting, Fault, Description, Corrective Action