Lochinvar WH 55-399 Sequence of operation, Operation, Display, Operating information

Models: WH 55-399

1 80
Download 80 pages 39.75 Kb
Page 68
Image 68
Sequence of operation

Installation & Operation Manual

11 Operating information

Sequence of operation

OPERATION

DISPLAY

1.Upon a call for heat, the gas pressure switch(es) must be closed.

2.Once the gas pressure switch(es) are closed, the control turns on the appropriate pumps (system and boiler pumps for space heating, DHW pump for DHW). The flow switch and/or LWCO must close.

3.The control turns on power to the louver relay. The louver proving switch, air pressure switch, and blocked drain switch must close.

4.The control starts the prepurge cycle by initiating the blower.

5.The control starts the trial for ignition by firing the spark electrode and opening the gas valve.

6.If flame is not detected after the sparking ends, the control will perform a postpurge, then start another prepurge cycle and try to light the burner again. The control will perform a total of 4 attempts before locking out.

7.If flame is detected, it holds the firing rate steady for a few seconds to let the flame stabilize, then it begins to modulate the firing rate based on a set point or some other command (such as a 0-10V BMS signal).

OPERATION 68 DISPLAY

Page 68
Image 68
Lochinvar WH 55-399 Sequence of operation, Display, Operating information, Installation & Operation Manual