Lochinvar WH 55-399 Hydronic piping continued, Installation & Operation Manual, Notice, Boiler

Models: WH 55-399

1 80
Download 80 pages 39.75 Kb
Page 43
Image 43
MAKE

Installation & Operation Manual

6 Hydronic piping (continued)

Figure 6-8Single Boiler - Multiple Temperature - DHW Priority

 

 

 

 

 

 

 

 

 

 

PRESSURE

TEMPERATURE

TEMPERATURE

TEMPERATURE

 

 

 

 

 

 

 

 

 

 

BACKFLOW

 

 

 

REDUCING VALVE

 

LOOP #1

 

LOOP #2

 

LOOP #3

 

 

 

 

PREVENTER

 

 

 

 

PRESSURE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GAUGE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MAKE

 

 

UP

SYSTEM

MIXING VALVES

WATER

(TYPICAL)

 

SUPPLY

 

SENSOR

 

AIR SEPARATOR BOILERIMG00190

 

EXPANSION

 

 

 

 

 

TANK

 

 

 

 

 

MAY SUBSTITUTE

 

 

 

WIRES TO

 

LOW LOSS HEADER

 

 

 

LOOP SENSORS

 

NOT TO EXCEED 4 PIPE DIA

120VAC TO PUMPS

 

MULTI-TEMP

BALL VALVE

OR MAX. OF 12" APART

 

24V SIGNAL TO

 

 

 

LOOP CONTROL

(TYPICAL)

Y-STRAINER

 

 

 

MIXING VALVES

 

 

 

(RECOMMENDED)

SHIELDED CABLE TO

 

 

 

 

 

 

DRAIN POINT

BOILER

 

BOILER CONTROL

 

 

(TYPICAL)

CIRCULATOR

DOMESTIC

 

 

 

 

 

 

 

FLOW CHECK

HOT WATER

HOT WATER

 

 

CIRCULATOR

ANTI-SCALD

 

VALVE

 

 

OUT

 

 

 

 

 

MIXING VALVE

 

 

 

 

 

COLD

 

 

 

 

 

WATER

 

 

 

 

 

IN

 

PRESSURE

 

 

 

 

 

RELIEF

 

 

 

 

 

VALVE

 

 

 

 

 

 

BOILER

 

 

 

UNION

DRAIN

 

 

 

(TYPICAL)

 

 

 

 

 

 

 

 

TEMPERATURE /

 

 

 

 

 

PRESSURE

 

 

IMG00190

 

GAUGE

 

 

 

 

CAUTION

NOTICE

Mixing valves are required for the protection of low temperature loops.

Please note that these illustrations are meant to show system piping concept only, the installer is responsible for all equipment and detailing required by local codes.

Manual background 43 Manual background

Page 43
Image 43
Lochinvar WH 55-399 Hydronic piping continued, Installation & Operation Manual, Notice, Boiler, IMG00190, Make