Installation & Operation Manual
1 Determine boiler location
Figure
LEFT
0" MINIMUM
1" MINIMUM CLEARANCE AROUND VENT PIPE
TOP | WARNING |
6" MINIMUM |
|
VENTILATING*
AIR OPENING
6"
RIGHT
0" MINIMUM
CLOSED DOOR
6"
VENTILATING*
AIR OPENING FRONT
For closet installations, CPVC, polypropylene or stainless steel vent material MUST BE used in a closet structure due to elevated temperatures. Failure to follow this warning could result in fire, personal injury, or death.
BOTTOM 0" MINIMUM
6" MINIMUM | *AREA OF EACH OPENING: | ||
|
|
|
|
1/4" MINIMUM CLEARANCE | 1 SQ. INCH PER 1000 BTU PER HOUR INPUT | ||
AROUND HOT WATER PIPES | WITH A MINIMUM OF 100 SQ. INCHES. |
RECOMMENDED SERVICE CLEARANCES:
FRONT: 24”
BOTTOM: 24”
LEFT SIDE: 12”
Note: Service clearances are recommendations only.
Figure
LEFT
0" MINIMUM
1" MINIMUM CLEARANCE AROUND VENT PIPE
BOTTOM 0" MINIMUM
TOP
6" MINIMUM
WARNING
RIGHT
0" MINIMUM
OPEN FRONT
FRONT
6" MINIMUM
1/4" MINIMUM CLEARANCE AROUND HOT WATER PIPES
For alcove installations, CPVC, polypropylene or stainless steel vent material MUST BE used in an alcove structure due to elevated temperatures. Failure to follow this warning could result in fire, personal injury, or death.
RECOMMENDED SERVICE CLEARANCES:
FRONT: 24”
BOTTOM: 24”
LEFT SIDE: 12”
Note: Service clearances are recommendations only.
8