Lochinvar WH 55-399 Hydronic piping continued, Installation & Operation Manual, Notice Notice

Models: WH 55-399

1 80
Download 80 pages 39.75 Kb
Page 47
Image 47
COLD

Installation & Operation Manual

6 Hydronic piping (continued)

Figure 6-12Single Boiler - Full Flow - Single Temperature Zoned with Circulators - DHW Piped as a Zone

ZONE #1

PRESSURE

 

PRESSURE

 

REDUCING VALVE

 

GAUGE

BACKFLOW

PREVENTER

MAKE UP

WATER

SYSTEM SUPPLY SENSOR

AIR SEPARATOR BOILERManual background

EXPANSION Manual background

TANK

ZONE #2 ZONE #3 ZONE #4

FLOW CHECK VALVE (TYPICAL)

Manual background ZONE CIRCULATORS (TYPICAL)

Y-STRAINER (RECOMMENDED)

DRAIN POINT Manual background (TYPICAL)

DOMESTIC

HOT

HOT WATER

WATER

CIRCULATOR

OUT

BALL VALVE

ANTI-SCALD

(TYPICAL)

MIXING VALVE

COLD

WATER

IN

PRESSURE

RELIEF VALVE

UNION (TYPICAL)

BOILER

NOTICE

NOTICE

 

 

 

 

 

 

 

 

 

 

 

INDIRECT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TEMPERATURE /

 

 

 

DRAIN

DHW TANK

 

 

 

 

 

 

 

 

 

 

 

PRESSURE

 

 

 

 

 

 

 

 

 

 

GAUGE

 

 

 

 

 

It is the responsibility of the installer to ensure that the minimum flow requirements of the boiler are met at all times during boiler operation. If the minimum flow requirements cannot be met at any time the boiler must be hydraulically separated from the system.

Please note that these illustrations are meant to show system piping concept only, the installer is responsible

for all equipment and detailing required by local codes.

Manual background 47

Page 47
Image 47
Lochinvar WH 55-399 Hydronic piping continued, Installation & Operation Manual, Notice Notice, Boiler, Cold Water In