Manuals
/
Lochinvar
/
Kitchen Appliance
/
Oven
Lochinvar
WH 55-399 operation manual 2 Operating Instructions - Models 55, Start-up
Models:
WH 55-399
1
60
80
80
Download
80 pages
39.75 Kb
57
58
59
60
61
62
63
64
<
>
Specification
Install
A Flue Products Chart
Gas valve replacement
Maintenance
Configuration of the cascade
Connecting gas supply piping
Address reported problems
Outdoor air reset
Variable speed pump setup
Page 60
Image 60
Installation & Operation Manual
10
Start-up
Figure
10-2
Operating Instructions - Models 55 - 285
o
60
Page 59
Page 61
Page 60
Image 60
Page 59
Page 61
Contents
Installation & Operation Manual Models: WH 55 -
WH-I-ORev H
Save this manual for future reference
Hazard definitions
Contents
When servicing boiler –
Please read before proceeding
Boiler operation –
Boiler water –
The Knight Wall Mount Boiler - How it works
Installation & Operation Manual
Models 55 -
Front View
Bottom View
Left Side inside unit
Ratings
Figure A High Altitude Label Location
Other Specifications
Installation & Operation Manual
Room Volume
Installation must comply with
Closet and alcove installations
Clearances for service access
Installation & Operation Manual
Note: Service clearances are recommendations only
1 Determine boiler location
Installation & Operation Manual
Residential garage installation
Precautions
1 Determine boiler location continued
Table 1A Corrosive Contaminants and Sources
Products to avoid
Areas likely to have contaminants
Installation & Operation Manual
Installation & Operation Manual
1 Determine boiler location continued
2 Prepare boiler
Remove boiler from wood pallet
Gas conversions
Figure 2-1 Boiler Mounted on Shipping Pallet
Figure 2-3 Installing Propane Orifice
2 Prepare boiler continued
Mounting the boiler
Mounting to a wood studded wall
3 General venting
Direct venting options - Sidewall Vent
Install vent and combustion air piping
Air intake/vent connections
Figure 3-6 Near Boiler Air Piping
CAUTION NOTICE
Requirements for installation in Canada
Sizing
Model
Kit Number
3 General venting continued
Materials
Air inlet pipe materials
DANGER
Optional room air
Air contamination
Table 3C
Optional Room Air Kit
Approved PVC/CPVC Vent Pipe and Fittings
PVC/CPVC
Table 3D PVC/CPVC Vent Pipe, and Fittings
Item
Polypropylene
Centrotherm InnoFlue SW
Duravent Polypro
NOTICE NOTICE
Z Flex
Stainless steel vent
FasNSeal
Saf-TVent
If using the alternate sidewall termination
4 Sidewall direct venting
Vent/air termination – sidewall
Model
4 Sidewall direct venting continued
Figure 4-2A Clearance to Gravity Air Inlets
Figure 4-3A Clearance to Forced Air Inlets
Installation & Operation Manual
Table 4B Sidewall Vent Centerline Dimensions
Vent
Centerline Width
Prepare wall penetrations
Multiple vent/air terminations
Installation & Operation Manual
4 Sidewall direct venting continued
Sidewall termination installation
Sidewall termination – optional concentric vent
Description and usage
Figure 4-6 Concentric Sidewall Termination
Installation & Operation Manual
4 Sidewall direct venting continued
NOTICE
NOTICE
Figure 4-12 Concentric Vent Sidewall Attachment
Multiventing sidewall terminations
Installation & Operation Manual
4 Sidewall direct venting
5 Vertical direct venting
Vent/air termination – vertical
Prepare roof penetrations
Installation & Operation Manual
Vertical termination installation
Figure 5-5 Do Not Install U-Bendto Rain Cap
Vertical termination – optional concentric vent
Prepare roof penetrations continued
Figure 5-6 Concentric Vent Roof Installation
5 Vertical direct venting continued
Multiventing vertical terminations
NOTICE
Alternate vertical concentric venting
Vent / Air Inlet Size
Minimum Existing
Vent / Chase Size
6 Hydronic piping
System water piping methods
General piping information
Low water cutoff device
Near boiler piping components
Boiler system piping
Boiler circulating pump
3. Domestic hot water circulating pump
6 Hydronic piping continued
Near boiler piping connections
Circulator sizing
Figure 6-1A Near Boiler Piping
20F Temperature Rise Applications
25F Temperature Rise Applications
35F Temperature Rise Applications
Figure 6-2 Pressure Drop vs. Flow
Variable speed pump setup
Variable speed pump option
Table 6B Recommended Variable Speed Pumps
Installation & Operation Manual
Installation & Operation Manual
6 Hydronic piping
INDIRECT
NOTICE
Installation & Operation Manual
6 Hydronic piping continued
NOTICE
ZONE #1
Installation & Operation Manual
6 Hydronic piping
NOTICE
INDIRECT
Number of Units
Required Pipe Sizes
Model
Installation & Operation Manual
6 Hydronic piping
Number of Units
Required Pipe Sizes
Model
Installation & Operation Manual
6 Hydronic piping continued
NOTICE
BOILER
Required Pipe Sizes
Installation & Operation Manual
6 Hydronic piping
Number of Units
Installation & Operation Manual
6 Hydronic piping continued
NOTICE NOTICE
BOILER
6 Hydronic piping
NOTICE NOTICE
ZONE #1
ZONE #2 ZONE #3 ZONE#4
Installation & Operation Manual
6 Hydronic piping continued
NOTICE NOTICE
BOILER
Connecting gas supply piping
7 Gas connections
Figure 7-1 Gas Supply Piping
Installation & Operation Manual
Figure 7-2 Inlet Pipe with Backup Wrench
7 Gas connections continued
Natural gas
Propane Gas
Natural Gas Pipe Capacity Chart
Table 7A Natural Gas Pipe Size Chart
Check inlet gas supply
Length of Pipe in Straight Feet for 1/2 PSI
Gas valve replacement
Gas Pressure
DETAIL A
Figure 7-3 Inlet Gas Supply Check
8 Field wiring
Installation must comply with
Figure 8-2 Line Voltage Field Wiring Connections
Figure 8-3 Routing Field Wiring
8 Field wiring continued
Louver proving switch
Flow switch
Thermostat
Alarm contacts
Wiring of the cascade
System supply sensor
Boiler management system
Installation
Fieldwiringcontinued
Manual
Operation
9 Condensate disposal
Condensate drain
Figure 9-1 Condensate Disposal
Installation & Operation Manual
Freeze protection when used
10 Start-up
Check/control water chemistry
Fill and test water system
Clean/Inspect Trap Assembly
Check for gas leaks
Inspect/fill condensate system
Check thermostat circuits
Final checks before starting the boiler
Start the boiler
If boiler does not start correctly
Check system and boiler
Figure 10-2 Operating Instructions - Models 55 -
10 Start-up
Figure 10-3 Operating Instructions - Model
Installation & Operation Manual
10 Start-up continued
Table 10A Flue Products Chart
Adjust set point temperatures
Check flame and combustion continued
Set space heating operation
Configuration of the cascade
NOTICE
Set domestic hot water DHW operation
Verify DHW mode
0 - 10V input set point or power
11 Operating information
General
How the boiler operates
Protection features
Outdoor air reset
11 Operating information continued
Ramp delay
Run-timeand alarm outputs
Service reminder
Error logging
High limit test procedure
Outdoor reset operation, if used
Reset curve
Cascade
Low water cutoff protection
Sequence of operation
OPERATION
DISPLAY
Installation & Operation Manual
Access modes
Installer
User
Installation & Operation Manual
Knight wall mount boiler control module
Figure 11-1 Control Panel
Installation & Operation Manual
11 Operating information
Indicators
Boiler Status
Call for Heat
Status Display Screens
Information
Operational
Status Display Screens cont’d
11 Operating information
Dial Function
key function
NAVIGATION
RIGHT SELECT
12 Maintenance Maintenance and annual startup
Service technician
Owner maintenance
Table 12A Service and Maintenance Schedules
12 Maintenance continued
Address reported problems
Annual cleaning
Inspect boiler area
12 Maintenance
Check ignition ground wiring
Check all boiler wiring
Check control settings
Check flame signal
Cleaning boiler heat exchanger
Figure 12-2 Burner Assembly
Perform start-upand checks
13 Diagrams
Figure 13-1 Ladder Diagram
Installation & Operation Manual
are connected or a fault condition is present
Figure 13-2 Wiring Diagram
Installation & Operation Manual
13 Diagrams continued
LOW VOLTAGE 120 VAC HIGH VOLTAGE
Revision A ECO #C06854 initial release
WH-I-ORev H 05/12