Manuals
/
Lochinvar
/
Kitchen Appliance
/
Oven
Lochinvar
WH 55-399 3 Operating Instructions - Model, Installation & Operation Manual
Models:
WH 55-399
1
61
80
80
Download
80 pages
39.75 Kb
58
59
60
61
62
63
64
65
<
>
Specs
Install
A Natural Gas Pipe Size Chart
Gas valve replacement
Dimension
Maintenance
Configuration of the cascade
Connecting gas supply piping
Address reported problems
Outdoor air reset
Page 61
Image 61
Installation & Operation Manual
10
Start-up
(continued)
Figure
10-3
Operating Instructions - Model 399
61
Page 60
Page 62
Page 61
Image 61
Page 60
Page 62
Contents
WH-I-ORev H
Installation & Operation Manual Models: WH 55 -
Save this manual for future reference
Contents
Hazard definitions
Please read before proceeding
When servicing boiler –
Boiler operation –
Boiler water –
Installation & Operation Manual
The Knight Wall Mount Boiler - How it works
Front View
Models 55 -
Bottom View
Left Side inside unit
Figure A High Altitude Label Location
Ratings
Other Specifications
Installation & Operation Manual
Installation must comply with
Room Volume
Closet and alcove installations
Clearances for service access
Note: Service clearances are recommendations only
Installation & Operation Manual
1 Determine boiler location
Residential garage installation
Installation & Operation Manual
Precautions
1 Determine boiler location continued
Products to avoid
Table 1A Corrosive Contaminants and Sources
Areas likely to have contaminants
Installation & Operation Manual
1 Determine boiler location continued
Installation & Operation Manual
Remove boiler from wood pallet
2 Prepare boiler
Gas conversions
Figure 2-1 Boiler Mounted on Shipping Pallet
2 Prepare boiler continued
Figure 2-3 Installing Propane Orifice
Mounting the boiler
Mounting to a wood studded wall
Direct venting options - Sidewall Vent
3 General venting
Installation & Operation Manual
Air intake/vent connections
Install vent and combustion air piping
Figure 3-6 Near Boiler Air Piping
CAUTION NOTICE
Sizing
Requirements for installation in Canada
Model
Kit Number
Materials
3 General venting continued
Air inlet pipe materials
DANGER
Air contamination
Optional room air
Table 3C
Optional Room Air Kit
PVC/CPVC
Approved PVC/CPVC Vent Pipe and Fittings
Table 3D PVC/CPVC Vent Pipe, and Fittings
Item
Centrotherm InnoFlue SW
Polypropylene
Duravent Polypro
NOTICE NOTICE
Stainless steel vent
Z Flex
FasNSeal
Saf-TVent
4 Sidewall direct venting
If using the alternate sidewall termination
Vent/air termination – sidewall
Model
Figure 4-2A Clearance to Gravity Air Inlets
4 Sidewall direct venting continued
Figure 4-3A Clearance to Forced Air Inlets
Installation & Operation Manual
Vent
Table 4B Sidewall Vent Centerline Dimensions
Centerline Width
Prepare wall penetrations
Installation & Operation Manual
Multiple vent/air terminations
4 Sidewall direct venting continued
Sidewall termination – optional concentric vent
Sidewall termination installation
Description and usage
Figure 4-6 Concentric Sidewall Termination
4 Sidewall direct venting continued
Installation & Operation Manual
NOTICE
NOTICE
Multiventing sidewall terminations
Figure 4-12 Concentric Vent Sidewall Attachment
Installation & Operation Manual
4 Sidewall direct venting
Vent/air termination – vertical
5 Vertical direct venting
Prepare roof penetrations
Installation & Operation Manual
Figure 5-5 Do Not Install U-Bendto Rain Cap
Vertical termination installation
Vertical termination – optional concentric vent
Prepare roof penetrations continued
5 Vertical direct venting continued
Figure 5-6 Concentric Vent Roof Installation
Multiventing vertical terminations
Installation & Operation Manual
Vent / Air Inlet Size
Alternate vertical concentric venting
Minimum Existing
Vent / Chase Size
System water piping methods
6 Hydronic piping
General piping information
Low water cutoff device
Temperature and pressure gauge
12.System temperature sensor
Near boiler piping components
Boiler system piping
Near boiler piping connections
6 Hydronic piping continued
Circulator sizing
Figure 6-1A Near Boiler Piping
25F Temperature Rise Applications
20F Temperature Rise Applications
35F Temperature Rise Applications
Figure 6-2 Pressure Drop vs. Flow
Variable speed pump option
Variable speed pump setup
Table 6B Recommended Variable Speed Pumps
Installation & Operation Manual
6 Hydronic piping
Installation & Operation Manual
INDIRECT
NOTICE
6 Hydronic piping continued
Installation & Operation Manual
NOTICE
ZONE #1
6 Hydronic piping
Installation & Operation Manual
NOTICE
INDIRECT
Required Pipe Sizes
Number of Units
Model
Installation & Operation Manual
Number of Units
6 Hydronic piping
Required Pipe Sizes
Model
6 Hydronic piping continued
Installation & Operation Manual
NOTICE
BOILER
Installation & Operation Manual
Required Pipe Sizes
6 Hydronic piping
Number of Units
6 Hydronic piping continued
Installation & Operation Manual
NOTICE NOTICE
BOILER
6 Hydronic piping
Installation & Operation Manual
NOTICE NOTICE
ZONE #1
6 Hydronic piping continued
Installation & Operation Manual
NOTICE NOTICE
BOILER
7 Gas connections
Connecting gas supply piping
Figure 7-1 Gas Supply Piping
Installation & Operation Manual
7 Gas connections continued
Figure 7-2 Inlet Pipe with Backup Wrench
Natural gas
Propane Gas
Table 7A Natural Gas Pipe Size Chart
Natural Gas Pipe Capacity Chart
Check inlet gas supply
Length of Pipe in Straight Feet for 1/2 PSI
Gas Pressure
Gas valve replacement
DETAIL A
Figure 7-3 Inlet Gas Supply Check
Installation must comply with
8 Field wiring
Figure 8-2 Line Voltage Field Wiring Connections
Figure 8-3 Routing Field Wiring
Outdoor temperature sensor
8 Field wiring continued
Louver proving switch
Flow switch
Wiring of the cascade
Alarm contacts
System supply sensor
Boiler management system
Fieldwiringcontinued
Installation
Manual
Operation
Condensate drain
9 Condensate disposal
Figure 9-1 Condensate Disposal
Installation & Operation Manual
10 Start-up
Freeze protection when used
Check/control water chemistry
Fill and test water system
Check for gas leaks
Clean/Inspect Trap Assembly
Inspect/fill condensate system
Check thermostat circuits
Start the boiler
Final checks before starting the boiler
If boiler does not start correctly
Check system and boiler
10 Start-up
Figure 10-2 Operating Instructions - Models 55 -
Installation & Operation Manual
Figure 10-3 Operating Instructions - Model
10 Start-up continued
Adjust set point temperatures
Table 10A Flue Products Chart
Check flame and combustion continued
Set space heating operation
Configuration of the cascade
Set DHW boiler target temperature
NOTICE
Set domestic hot water DHW operation
0 - 10V input set point or power
Temperature control
11 Operating information
General
Ramp delay
Protection features
Outdoor air reset
11 Operating information continued
Run-timeand alarm outputs
Boiler temperature regulation
Service reminder
Error logging
Target temperature with outdoor reset
Outdoor reset operation, if used
Reset curve
Cascade
OPERATION
Sequence of operation
DISPLAY
Installation & Operation Manual
Installer
Access modes
User
Installation & Operation Manual
Figure 11-1 Control Panel
Knight wall mount boiler control module
Installation & Operation Manual
11 Operating information
Boiler Status
Indicators
Call for Heat
Status Display Screens
Operational
Information
Status Display Screens cont’d
Installation & Operation Manual
key function
Dial Function
NAVIGATION
RIGHT SELECT
Service technician
12 Maintenance Maintenance and annual startup
Owner maintenance
Table 12A Service and Maintenance Schedules
Address reported problems
12 Maintenance continued
Annual cleaning
Inspect boiler area
Check ignition ground wiring
12 Maintenance
Check all boiler wiring
Check control settings
Cleaning boiler heat exchanger
Check flame signal
Figure 12-2 Burner Assembly
Perform start-upand checks
Figure 13-1 Ladder Diagram
13 Diagrams
Installation & Operation Manual
are connected or a fault condition is present
Installation & Operation Manual
Figure 13-2 Wiring Diagram
13 Diagrams continued
LOW VOLTAGE 120 VAC HIGH VOLTAGE
WH-I-ORev H 05/12
Revision A ECO #C06854 initial release