9-10 Preparations for Touchscreen Assembly of the Touchscreen

Front Case Assy TS Tape

Attachment
Standard
Attachment
Standard
Attachment
Standard
TOUCH SCREEN ASSY
TOUCH SCREEN ASSY
Protect
Sheet
TS FPC
Spacer
Touch Screen
LCD Side Cushion T5
LCD Side Cushion T2
LCD Side Cushion T5
TS Spacer A
LCD Side
Cushion T8
LCD Side
Cushion T8
TS Side Spacer
LCD FPC Spacer
A
T/S
T/S
NG
OK
2~4mm
0~0.5mm
25–1mm
TS Side Spacer
(Note)
Apply the load 20 to 30N (2.0 to 3.0 Kgf) to the Cushions.
Attach the surface to the LCD Front.
<tentative measure>
After attaching the Protection Film
using jig (auto-attachment machine),
lift the film from both sides.
(like trash-catch)
*Remove it parallel to the T/S.
Laminate
Film
Laminate
Film
Attach to the center
of the display surface.
(Using the jig)
Dimensional
tolerance: +0.2
-
-
edge standard:
+1mm
Attachment
Standard
Attachment
Standard
Fit to the stand wall and
attach to the undersurface.
1 to 1.5 mm from
the Front Frame
1 to 1.5 mm from
the Front Frame
2 to 3 mm from
the Front Frame
Ensure TS spacer A, TS side
spacer and LCD FPC spacer
doesnot run over the display side.
Ensure TS side spacer does
not runover both edges of
TS glass.
Turn the notch of the
Sheet to outside.
0.5 to 1 mm from
the Front Frame
Attach to
the wall.
Details of "A"
stiffening
plate side
Fit to the stand
wall and attach
to the undersurface.
Fit to the stand
wall and attach
to the undersurface.
Fit to the stand
wall and attach
to the undersurface.
edge standard
+1 mm
edge standard
+1 mm