9.2.4.Setting the Dock Con PCB

1.Fix the Docking PCB Sheet, the Base Joint Cover and the Dock Con PCB using five Screws <N3>. No1 to No5

2.Connect the two Cables to the two connectors (CN600, CN601) of the Dock Con PCB.

3.Attach the FFC Hold Cushion.

Note:

Tighten the Screws in the numbered order (No1 to No5).

Screws <N3>:DXQT26+D5FNL

No.4 No.3 No.5 <N3> <N3> <N3>

Dock Con P.C.B.

Docking P.C.B. Sheet

Base Joint Cover

<N3>

<N3>

No.1

No.2

Dock Con P.C.B. FFC Hold Cushion

Connector(CN601)Connector(CN600)

9-13

Page 37
Image 37
Matsushita CF-08TX1A1M manual Setting the Dock Con PCB