System Setup
2.0ScopeSystem Setup describes receiving and handling of the Galaxy PW™ 100 to 225kVA, a description of major compo- nents, the battery cabinet, and definition of the control panel indicators, which includes electrical, mechanical and environmental specifications.
MGE also recommends obtaining an MGE field service engineer for final installation and basic startup for single and parallel units.
CAUTION | Scheduling of the MGE Field Service Engineers typically should be done 7 to |
| 10 days before they are required |
| to maintaining your schedule, please call the MGE toll free telephone number |
| at |
| quick installation for the initial safe startup and configuration of your Galaxy PW™. |
|
|
Final installation and
Step 1. Unpack and position the unit.
Step 2. Connect the main (utility) power.
Step 3. Connect the power circuits.
2.0.2Final steps by MGE Field Service EngineerStep 4. Call MGE and wait for the MGE Field Service Engineer to complete the installation.
Step 5. The MGE Field Service Engineer finalizes installation and the startup process.
Optional: | Procedure for temporary power prior to the final startup. |
The following equipment and tools are recommended for
◗Digital volt meter (DVM)
◗1/8 inch slotted screwdriver
◗Pallet jack/forklift
◗Conduit installation tools
◗Nut driver set