Operation
4.0ScopeOperation describes the
WARNING | Rectifier/charger |
| is closed. DC voltage is present in the DC bus. |
|
|
Rectifier/charger
Figure
1 | 2 | 3 | 4 | 5 |
| 6 |
|
|
1 |
|
|
|
|
|
|
|
|
2 |
|
|
|
|
|
| 7 | normal |
|
|
|
|
|
|
| AC | |
22 |
|
|
|
|
|
| 8 | input (1) |
|
|
|
|
|
|
| ||
9 | 10 |
| 11 | 12 | 13 | 145 | 15 |
|
|
|
|
|
| V | A | W.Hz |
|
|
|
|
|
|
|
| 17 |
|
|
|
|
| 16 |
|
| 18 |
|
rectifier/
charger (A):
AC to DC power
*FUSE
Q1 isolation and
protection harmonic fliter
inverter (B): DC to AC power
isolation and protection:
Q5N
*FUSE
QF1: isolation and protection
battery (D):
backup power
| fault |
| bypass |
|
|
| |
19 | 20 | 21 | AC |
input (2) |
isolation: |
|
Q4S | static bypass (C): |
maintenance bypass:
Q3BP
When the rectifier/charger is on, press the "inverter ON" button 7 on the control panel. The green "inverter" light 4 flashes.
4.1.2Emergency Power Off (EPO)The UPS emergency shutdown function is generally wired to a
IMPORTANT | After EPO/REPO, unit has to be reset by opening M2 feed (switch Q4S). Open |
| switch Q5N also, and then follow the procedure of single UPS for single unit or |
| parallel UPS for parallel units to |
|
|
Operation | 4 — 1 |