Setup and Installation

2.0Scope

Setup and Installation guides the user through tools and equipment required for connecting the EX 5/7/11RT and battery installation or replacement. Included are assembly instructions, power cable connections with wire diagrams for configuring the product to hardware specifications.

2.1Unpacking and Parts Check

Once the EX 5/7/11RT systems has been inspected and received from the shipping courier, the unit should be moved to a position as close to the final installation location as possible. See Figures 2-1, on page 2-2.

All Modules are shipped in separate boxes.

Prior to any installation, the following items should be observed upon receipt of the EX 5/7/11RT.

1.Inspect shipment for any damage prior to receipt. Damage claims should be filed directly with the courier. Replacements for damaged components should be ordered through MGE Customer Support Services at 1-800-438-7373.

2.Remove wrapping and foam corners to verify that the equipment nameplate (located on the rear of the units) details a system that corresponds with the equipment ordered.

86-86000-00 B00

Installation

2 — 1

Page 27
Image 27
MGE UPS Systems EX-5, EX-7, EX-11RT manual Unpacking and Parts Check, All Modules are shipped in separate boxes