Operation
3.0Scope
Operation describes EX 5/7/11RT systems characteristics of indicators and controls, modes and specifications and theory of operating the EX 5/7/11RT. The user procedures include performing software programming that will maintain smooth performance. Refer to Figure 1.6 for descriptions of circled numbers.
3.1Initial Startup
NOTE | Both AC and DC sources must be present for normal startup of EX 5/7/11RT |
| systems. If the system is configured for cold start, the AC and DC sources are |
| required for initial startup only. |
|
|
1. | Check that the manual bypass switch 7 | is on Normal position. |
2. | Set the Normal AC source circuit breaker | 8 to the ON position. |
3. | Set the battery circuit breaker 14 to the ON position. |
The load is powered via the Bypass AC source, but not protected by the UPS.
Batteries are recharging, an
LED 17 is ON.
Figure 3-1: Initial Startup Display.
17
OFFON
Operation | 3 — 1 |