Middleby Marshall PS200-R68 Section Maintenance, III. MAINTENANCE - EVERY 3 MONTHS

Models: PS200-R68

1 88
Download 88 pages 30.08 Kb
Page 56
Image 56
III. MAINTENANCE - EVERY 3 MONTHS

SECTION 4

MAINTENANCE

III. MAINTENANCE - EVERY 3 MONTHS

NOTE: It is recommended that the 3 Month Maintenance schedule be performed by an Authorized Middleby Marshall Service Agent.

CAUTION:

All electrical power should be shut OFF

and locked out or tagged out before attempting

maintenance in steps "A" thru "D".

A. Cleaning fan motor

NOTE: It is recommended that step "A" thru "D" be performed by an authorized Middleby Marshall Service Agent.

To gain access to the fan motor, open the machinery compartment door by removing three screws. Clean the fan motor, burner motor, conveyor motor and the surrounding area using either compressed air or CO2. Thoroughly blow out the motor compartment and vents inside the motor. Failure to do this could cause premature failure of the electric motor.

B. Electrical terminals

Open machinery compartment door by removing three screws from the door. Tighten all electrical terminal screws on all components. Also tighten electrical terminal screws in the remote controls.

Machinery

 

Machinery

Compartment

 

 

Compartment

 

 

 

Fan Motor-

Door

 

 

 

Blow out in

 

 

this area

 

Conveyor

D.C.

Motor

Burner

Blower

Motor

Figure 4-31.

50

Page 56
Image 56
Middleby Marshall PS200-R68 Section Maintenance, III. MAINTENANCE - EVERY 3 MONTHS, A. Cleaning fan motor