Middleby Marshall PS200-R68 Section Maintenance, IV. MAINTENANCE - EVERY 6 MONTHS, Quantity

Models: PS200-R68

1 88
Download 88 pages 30.08 Kb
Page 59
Image 59
IV. MAINTENANCE - EVERY 6 MONTHS

SECTION 4

MAINTENANCE

IV. MAINTENANCE - EVERY 6 MONTHS

NOTE: It is recommended that the 6 Month Maintenance schedule be performed by an Authorized Middleby Marshall Service Agent.

CAUTION:

All electrical power should be shut OFF

and locked out or tagged out before attempting

maintenance in steps "A" thru "C".

A. Check brushes on D.C. conveyor motor, when worn to less than 3/32" (2.2mm) replace.

B. Burner nozzle and electrode assembly should be cleaned and inspected. Also check your oven venting system.

C. Check conveyor shaft bushings and spacers. Replace them if they are worn.

MAINTENANCE PARTS

The following parts were shipped inside the control compartment of your oven to be used for preventive maintenance or as spares. It is recommended that whenever you use one of these parts you should order a replacement from your local authorized Middleby Marshall Parts Distributor.

QUANTITY

MIDDLEBY MARSHALL

DESCRIPTION

 

PART NUMBER

 

 

 

 

2

28154-0003

TRM 9 Amp Fuse (See Figure 6-3)

1

22181-0034

Fan Belt (Refer to previous

 

 

page for fan belt replacement.

 

 

 

53

Page 59
Image 59
Middleby Marshall PS200-R68 Section Maintenance, IV. MAINTENANCE - EVERY 6 MONTHS, Maintenance Parts, Quantity