Multiquip MQP40IZ, MQP20IZ, MQP45GM, MQP60IV, MQP50IZ Pre-Startpreparation, Run the Generator Set

Models: MQP60GM MQP30DZ MQP30GM MQP50IZ MQP60IV MQP45GM MQP40IZ MQP20IZ

1 94
Download 94 pages 19.21 Kb
Page 81
Image 81
PRE-START PREPARATION

PRE-START PREPARATION

Run the Generator Set

The final check is to observe the drive belt when the engine is running.

1.Open the generator main line AC circuit breaker. - When starting the engine for the first time after completing the generator set site installation, confirm that the drive belt is properly fitting in all grooves in the pulleys. This only requires visual inspection.

2.If the belt wanders, walks, or jumps between pulleys, either the fan drive needs to be realigned, or the belt was improperly installed.

Wear safety glasses and stand far from the running fan drive without guards installed. A misaligned fan drive or improperly installed drive belt can cause the belt to break. A properly aligned and installed belt can grab loose clothing or body parts, causing severe injury.

3.If the belt or drive needs to be corrected, stop the engine and disconnect the negative lead (-) of the starting battery. Then disassemble the fan drive guard, realign the fan drive pulley, and check for alignment again.

4.After the belt is properly installed, start the genset and check for belt walk again.

5.Stop the genset and disconnect the battery negative. Attach the remaining side guard bracket to the pedestal and side fan drive guard to the bracket.

Contact with hot coolant can result in serious burns. Allow the engine to cool before loosening the radiator cap or coolant drain.

6.Recheck coolant levels after engine cools. Add coolant if required.

7.Check oil level. Add oil if required.

8.Visually check the unit for fuel, water, or coolant leaks.

9.Double check for loose fittings and/or connectors.

10.Re-connect the battery cables and tighten securely.

11.Program and/or adjust the configuration of the generator controls to the appropriate, required position. If the unit is to remain in-service, place the control in the "AUTO" position.

12.Close the generator main line AC circuit breaker.

13.The unit is now ready to automatically start and provide emergency standby power.

INDUSTRIAL GENERATOR SETS — APPLICATION & INSTALLATION MANUAL — REV. #4 (09/07/07) — PAGE 81

Page 81
Image 81
Multiquip MQP40IZ, MQP20IZ, MQP45GM, MQP60IV, MQP50IZ, MQP30GM, MQP30DZ, MQP60GM Pre-Startpreparation, Run the Generator Set