Nokia DNT2Mi sp/mp Front, Automatic, panel, management, control, Equipment tests, Power up test

Models: DNT2Mi sp/mp

1 128
Download 128 pages 44.97 Kb
Page 52
Image 52
Front

Data Network Terminal Single-port and Multiport Operating Instructions

The following tests are available for testing a DNT2Mi terminal:

Table 14.

Tests available for DNT2Mi

 

 

 

 

 

 

 

 

 

Front

Q1

 

Automatic

Note

 

panel

management

 

control

 

 

 

 

 

 

 

 

Equipment tests

 

 

 

 

 

 

 

 

 

 

 

 

 

Power up test

 

 

 

 

After power is

 

 

 

 

 

 

switched on

 

 

 

 

 

 

 

Self test

Equipment

Self test (5,4)

 

 

 

 

self test

 

 

 

 

 

 

 

 

 

 

 

Line interface test

 

 

 

 

 

 

 

 

 

 

 

 

Network test loop

Line DL

Loop to line (DL)

 

 

See Figure “Network

ITU-T X.150 loop 2

test

 

 

 

 

test loop (all ports)”

 

 

 

 

 

after this table.

Data coming from the line is

 

 

 

 

 

 

 

 

 

 

 

looped back to the line.

 

 

 

 

 

 

 

 

 

 

 

 

 

Dedicated port tests

 

 

 

 

 

 

 

 

 

 

 

 

Local test loop

Port LL test

Loop to DTE (LL)

 

V.xx Circuit 141

Automatic control can

ITU-T X.150 loop 3

 

 

(5,2,#,3)

 

or X.21 loop 3

be disabled by setting

 

 

 

 

command

circuit 141 in the ‘Not in

Data coming from the DTE is

 

 

 

 

 

 

 

 

 

use’ state.

looped back to the DTE.

 

 

 

 

 

 

 

 

 

 

See Figure “Local test

 

 

 

 

 

 

 

 

 

 

 

 

loop in a port” after this

 

 

 

 

 

 

table.

 

 

 

 

 

 

Network test loop

Port DL

Loop to line (DL)

 

 

See Figure “Network

ITU-T X.150 loop 2

test

 

(5,2,#,2)

 

 

test loop (single-port)”

 

 

 

 

 

after this table.

Data coming from the line is

 

 

 

 

 

 

 

 

 

 

 

looped back to the line.

 

 

 

 

 

 

 

 

 

 

 

 

 

52 (128)

© Nokia Corporation

DN01145897

 

Nokia Proprietary and Confidential

Issue 2-0 en

Page 52
Image 52
Nokia DNT2Mi sp/mp Front, Automatic, panel, management, control, Equipment tests, Power up test, Self test, 5,2,#,3