Premier Floors manual Electrical

Models: Floors

1 56
Download 56 pages 20.64 Kb
Page 33
Image 33
Electrical

fasten the OSB into the 2x lumber with 8d nails 6” o.c. or according to the engineers requirements.

Where vapor retarders are required they should be applied before the installation of the Insul-Lam panels. Roof cladding and/or finish materials should be installed according to the manufacturer’s specifications and recommendations.

Electrical

General Guidelines

Never cut long grooves in the skin of a panel. Long grooves in the skin can seriously compromise the structural integrity of your panels. When necessary, you

may cut 4” access holes and use a long remodelers flex bit with a catch hook to run wires where a chase may not exist.

Use vertical chases and interior walls whenever possible for most of your wiring needs.

Use a remodeler’s box that has flanges so the box can be fastened directly to the panel skin.

33

Page 33
Image 33
Premier Floors manual Electrical