Another option: Once the top plate is in, you may now also hang joists directly from the wall panel. Use a joist hanger with a nailable top flange. The flange should bear at least 1.5” (2” is best) on to the top plate. Nail the top flange following the fastening schedule specified by the engineer.
As always, consult with your engineer of record concerning your specific design requirements.
27