•Do not put plumbing inside SIPs.

Make sure to drill the top and bottom plates for the vertical electrical chases in the wall panels.

Do not put plumbing inside SIPs.

Do not cut the skins (OSB) for extra electrical chases or plumbing.

Do not pick up the SIPs by the edge of the top skin.

Remove debris from sill plate before you place the SIP wall panel on it.

Use mastic on all connections as shown in the PBS details.

Make sure that both of the wall SIPs skins are bearing on the floor.

Follow proper nailing requirements according to details and job specific engineering.

Plumb each SIP in each direction, then secure with nails.

Fill all voids with expanding foam.

Do not apply interior or exterior materials over wet SIPs.

5

Page 5
Image 5
Premier Floors manual Do not put plumbing inside SIPs, Fill all voids with expanding foam