PBS SIPs Tips

PBS SIPs Tips

Project must meet local code.

Confirm your installation date at least two weeks prior to requesting on-site assistance.

Schedule a preconstruction meeting with your installation crew (concrete, plumbing, electrical, siding, roofing, etc.).

Inventory materials when you receive them.

Check all SIPs for proper cuts and recesses.

Double check SIPs sizes and compare to shop drawings before installation.

Engineered details take prescedence over PBS details.

PBS details regarding mastic and SIPs tape need to be followed.

Any changes required at the job site should be communicated with the technical representative.

Make sure your foundation or floor is level and square.

Fabricate and pre-install dimensional or I-joist spline material as specified.

Review engineering for hold downs if applicable.