Manuals
/
Premier
/
Household Appliance
/
Flooring
Premier
Floors
manual
Insul-BeamII, Header Loads, Premier, Load Chart
Models:
Floors
1
48
56
56
Download
56 pages
20.64 Kb
45
46
47
48
49
50
51
52
Install
Load Chart
Panel Basics - Assembly
Checklist
Page 48
Image 48
Page 47
Page 49
Page 48
Image 48
Page 47
Page 49
Contents
installation guide
Introduction
Table of Contents
PBS SIPs Tips
Do not put plumbing inside SIPs
Fill all voids with expanding foam
Storage & Handling
Checklist of Tools
Spline Connection
Lumber Connection
I-JoistConnection
Panel Basics - Assembly
Fasteners
Field Fabrication
Page
Field Fabrication Rake/Gable Walls
Floors
Page
PANEL TIP Stagger your panel placement with two panels on one side of the beam, four panels on the other side, and four back on the first side of the beam. This will help your beam stay straight
Sill Plates
Page
Walls
STEP 2. LAYOUT TRANSFER
STEP 3. PANEL TILT
STEP 4. ADJACENT PANEL
STEP 5. FASTENING
STEP 6. TOP PLATE
Headers
Page
Intermediate Floors
Page
Roofs
On the Ground
Lifting Panels
Page
Page
Insul-Lam
Electrical
Where walls terminate against a panel
you can drill at the horizontal electrical
Plumbing
Shearwalls
Premier Panel R-Values
Panel Core
Panel Core
Panel Span ft
Panel Core
Panel Core
Panel Core
Panel Core
Load Chart
Header
Header
Insul-BeamII
Header Loads
Premier
Load Chart
No. of
Panel
Panel
Minimum
Pressure Chart 1 of
Load Chart 12 Wind
Speed
Pressure Chart 2 of
Load Chart 12 Wind
Speed
Page
REGIONAL FIELD OFFICES NORTHWEST
4609 70th Ave. East Fife, WA
SOUTHWEST
3434 W. Papago St. Phoenix, AZ
Top
Page
Image
Contents