R

CB1200-I Pellet Insert

H.Removing Metal Floor of Factory-Built Firebox

The firebrick (refractory), glass doors, screen rails, screen mesh and log grates can be removed from a factory-built firebox in order to gain minimum insert opening requirements.

Any smoke shelves, shields and baffles may be removed from a factory-built firebox if attached with mechanical fasteners.

The metal floor of the factory-built firebox may be removed to facilitate the installation of the insert only when a 1 inch (25mm) airspace is provided between the insert and the floor of outer wrap.

If the floor is made of thin metal, we recommend using a Quarda-Fire floor protector, Part 811-0730, which is available through your dealer.

Starter hole

Mark area of floor to cut

Figure 11.1. Measure and mark the metal floor for cutting. With a drill, make a starter hole in each corner.

Keep sharp edge of metal floor away from power cord

Figure 11.3. Place the insert into the fac- tory-built firebox. Ensure that the power cord can not be damaged by the sharp metal edge. You may need to cut out a notch to accommodate the cord.

Figure 11.2. Using a saws-all, cut out the floor.

October 26, 2006

7014-083C

Page 11

Page 11
Image 11
Quadra-Fire CB1200I-B owner manual Starter hole Mark area of floor to cut