| R |
|
|
|
|
|
|
|
7 | Appliance |
|
|
|
A.Rear Shroud Installation
1.Top Vent Installations
Parts Required:
Part
Includes: Six galvanized steel shroud pieces, two cover plates and fastener package.
Part
Includes: Vent pipe and two 1/4 - 20 x 3/4" bolts with nuts.
Part
2.Rear vent installations Parts Required:
Part
Includes: Rear Vent Adapter and fastener package.
|
|
|
|
| REAR SHROUD TOP | ||
|
|
|
| VENT PART | |||
|
|
|
|
|
| Right Corner | |
Top Vent Opening | |||||||
Left Corner |
|
|
|
|
|
| |
| Left | Corner | |||||
|
| Piece | |||||
| Filler | ||||||
|
|
| |||||
Rear | |||||||
Knock | Access | ||||||
Vent | |||||||
|
|
|
|
|
| ||
Outside | Air | Vent | |||||
| |||||||
|
|
|
| ||||
Pipe | Access | ||||||
|
|
|
|
|
Tools Required:
Electric drill, 1/8" drill bit, Phillips screw driver, 3/8" wrench & 7/16" wrench, (7/16" socket wrench & high temperature silicone adhesive are also required for rear vent installations).
Figure 17.1
Complete the following procedures, based on your venting installation, prior to installing the rear shroud kit. (Note: All photos depict top vent installation).
Top Vent Installation Preparation
Filler Piece
Figure 17.2
Rear Shroud
Top Vent
Figure 17.3
1.Remove the top vent adapter from the vertical exhaust transition pipe. Figures 17.2 and 17.5.
2.Use 2 screws to attach left corner filler piece of rear shroud to the insert hopper. Figures 17.1 and 17.2.
3.Use (2) 1/4 - 20 x 3/4" bolts with nuts to install rear shroud top vent to the exhaust transition. See boxed area in Figure 17.3. (Circled area, top vent adapter, will be installed later).
4.Install the left shroud panel corner at 3 points, 2 screws into back of hopper and 1 down into the filler piece).
Figure 17.4
Left Corner |
Piece |
Figure 17.4
Vertical Exhaust |
Transition Pipe |
Top Vent Adapter |
Figure 17.5
October 26, 2006 | Page 17 |