3. HOW TO INSTALL THE INDOOR UNIT
■
This unit uses a drain pump. Use a carpenter’s level to check that the unit is level.
3-2. Suspending the Indoor Unit
(1)Fix the suspension bolts securely in the ceiling using the method shown in the diagrams (Figs.
(2)Follow Fig.
Table | Unit: in. (mm) |
Note: For DC Fan Tap Change Procedure for
|
| X | |
Concrete | Insert |
Suspension bolt (M10 or 3/8") (field supply)
Fig.
Length | A | B | C | D | |
Type | |||||
12, 18, 24, 36 | |||||
(788) | (723) | (885) | (885) | ||
| |||||
|
|
|
|
|
(3)Determine the pitch of the suspension bolts using the supplied full- scale installation diagram. The diagram and table (Fig.
Table |
|
|
|
|
|
| Unit: in. (mm) | ||
|
|
|
|
|
|
|
|
|
|
Length | A | B |
| C |
| D |
| E |
|
Type |
|
|
|
| |||||
12, 18, 24 |
|
|
|
| |||||
(113) | (173) |
| (256) |
| (210) |
| (88) |
| |
|
|
|
|
| |||||
36 |
|
|
|
| |||||
(113) | (173) |
| (319) |
| (210) |
| (88) |
| |
|
|
|
|
| |||||
|
|
|
|
|
|
|
|
| |
|
| Drain outlet(other side) |
|
| Refregerant tubing joint(liquid side) | ||||
|
|
| (VP25) |
|
|
B (suspension bolt pitch)
A (suspension bolt pitch)
C (ceiling opening dimension)
Fig.
Refregerant tubing joint(gas side)
D (ceiling opening dimension)
Suspension lug |
|
| |
|
| C | |
D | B | 8 (35) | |
E | A | ||
| Power supply outlet | Unit: in. (mm) | |
Fig. | |||
|
3-3. Placing the Unit Inside the Ceiling
(1)When placing the unit inside the ceiling, determine the pitch of the suspension bolts using the supplied
Tubing and wiring must be laid inside the ceiling when suspending the unit. If the ceiling is already constructed, lay the tubing and wiring into position for connection to the unit before placing the unit inside the ceiling.
19/32 (15) |
Over |
Supplied bolt
– 43/64 | 17) |
15/32 | (12 – |
| |
(printed on top of container box) | Unit: in. (mm) |
|
Fig.
25