Sapphire Audio DV425TR owner manual VERTICAL INSTALLATION, cont, Step, Nails Ceiling Firestop

Models: DV425TR

1 60
Download 60 pages 11.22 Kb
Page 36
Image 36
NAILS

DV425TR DIRECT VENT ROOM HEATER

VERTICAL INSTALLATION, cont.

Step 8.

Twist-lock the vent cap and seal.

Note:

(1)For multi-story vertical installations, a ceiling firestop (SDV part #963) is required at the second floor, and any subsequent floors (Figure 16). The opening should be framed to 10” x 10” (254mm x 254mm) inside dimensions, in the same manner as shown in Figure 13.

(2)Any occupied areas above the first floor, including closets and storage spaces, which the vertical

vent passed through must be enclosed. The enclosure may be framed and sheetrocked with standard construction materials; however, refer to these installation instructions for the minimum allowable clearance between the outside of the vent pipe and the combustible surfaces of the enclosure. Do not fill any of the required air space with insulation.

NAILS

CEILING FIRESTOPFigure 16

Figure 16

MIN. 1' CLEARANCE

MIN. 1' CLEARANCE MIN. 1' CLEARANCE

MIN. 1' CLEARANCE

Manual backgroundMIN. 1' CLEARANCE

02/01

Page 36

250-5533

Page 36
Image 36
Sapphire Audio DV425TR VERTICAL INSTALLATION, cont, Step, Nails Ceiling Firestop, MIN. 1 CLEARANCE MIN. 1 CLEARANCE