Sapphire Audio DV425TR owner manual VERTICAL INSTALLATION, cont, Step

Models: DV425TR

1 60
Download 60 pages 11.22 Kb
Page 34
Image 34
VERTICAL INSTALLATION, cont.

DV425TR DIRECT VENT ROOM HEATER

VERTICAL INSTALLATION, cont.

Step 4.

Assemble the desired lengths of GS pipe and elbows necessary to reach from the stove up through the round support box. Ensure that all pipe and elbow connections are in their fully twist-locked position. Be sure to seal the outer pipe with appropriate sealant (high temperature silicone).

Step 5.

Cut a hole in the roof centered on the small drill hole placed in the roof in Step 2. The hole should be of sufficient size to meet the minimum requirements for clearance to combustibles, as specified. Continue to assemble lengths of pipe and elbows necessary to reach from the ceiling support box up through the roof line. Galvanized pipe and elbows may be utilized in the attic, as well as above the roofline. The galvanized finish is desirable above the roofline, due to its higher corrosion resistance.

NOTE:

(1)If an offset is necessary in the attic to avoid obstructions, it is important to support the vent pipe every 3’ (91.4cm) to avoid excessive stress on the elbows, and possible separation. Wall straps are available for this purpose (page 32, Figure 11).

(2)Whenever possible, use 45° elbows, instead of 90° elbows. The 45° elbow offers less restriction to the flow of flue gases and intake air.

Step 6.

Slip the flashing over the pipe section(s) protruding through the roof. Secure the base of the flashing to the roof with roofing nails. Ensure the roofing material overlaps the top edge of the flashing as shown in Figure 14. Verify that the chimney is the required height above the roof. See Roof Pitch Table on page 35 of this manual

 

SHINGLES OVERLAP ON

CAP AND STORM

Fig. 14

TOP EDGE OF FLASHING

COLLAR

 

NOT SHOWN FOR

 

 

CLARITY

02/01

Page 34

250-5533

Page 34
Image 34
Sapphire Audio DV425TR owner manual VERTICAL INSTALLATION, cont, Step