10.Wrap the Weight Cable (52) around a 2" Pulley (4). Attach the Pu]Yeyto the Right Arm (16) with a 3/8" x 1 3/4" BOlt(40) and 3/8" N/lock Nut (6).
Lay the Weight Cable (52) over a 3 1/2" Pulley (5). Attach a Cable Trap (67) and the Pulley to the side of the Upright (9) with a 3/8" x 1 3/4" Bolt (40) and 3/8" N/lock Nut (6}. ' _ake sure that the Cobb Trap is in the "12 o'clock" position.
1I. Wrap the Weight Cable (52) under a 2 3/4' Pulley (13). Attach the Pulley to the bracket on the side of the Moment Arm (74) with a 3/8" x 1 3/4" Bolt (40) and 3/8" Nylock Nut (6).
Attach the end oFthe Weight Cable (52) to the right side oF the Leg Developer (23) with a 3/8" x 2" Bolt
(45)and 3/8" Nylock Nut (6). Do not overfighten the Nylock Nut, the Cable must be able to swivel
freely or it will be damaged.
12.Insert the threaded bolt on the end oFthe Weight Cable (52) into the Adjustment Bracket (53). Thread the 5/16" Nut (82) exactly two complete turns onto the threaded boil
13.Wet the upper ends of the Left and Right Arms (15,
16)and the insides of the two Large Pads (17) with soapy water. Slide the Large Pods onto the Arms.
Attach theBackrest(19) to theUpright (9) w_ two 1/4" x 2 1/2" Bolts(46).
10
4O
11
12
6