Reading and resetting of the daily net totals

The subsequent printout occurs in the same format as in the sample X report.

Reading and resetting of a stacked report

You can print multiple X1/Z1 reports in sequence at a time.

In this case, you need to program in advance what X1/Z1 reports should be printed in the stacked report sequence.

Note

The following job code numbers alone can be used for stacked report printing. Job code number: 200, 210, 213, 220, 227, 229, 230, 231, 232, 240, 250, 270

Refer to “Selection of X1/Z1 and X2/Z2 reports to be printed in the stacked report sequence” for details.

88

Page 90
Image 90
Sharp ER-A440 instruction manual Reading and resetting of the daily net totals