Siemens E12 manual Objective, Prerequisites

Models: E12

1 47
Download 47 pages 15.77 Kb
Page 5
Image 5

Industry Automation and Drive Technologies - SCE

1 PREFACE

Regarding its content, Module E12 is part of the instruction unit ’IT Communication with S7’.

Fundamentals of

STEP7 Programming

2 to 3 days Modules A

Programming

Languages

2 to 3 days Modules C

Additional Functions of STEP7 Programming

2 to 3 days Modules B

Industrial Fieldbus

Systems

2 to 3 days Modules D

System Simulation with SIMIT SCE

1 to 2 days Modules G

Process

Visualization

2 to 3 days Modules F

Frequency Converter at SIMATIC S7

2 to 3 days Modules H

IT Communication with SIMATIC S7

2 to 3 days Modules

E

Objective

In Module E12, the reader learns how networking and data exchange between PLCs and the vision sensor evaluation device VS120 is set up.

As PLC, the CPU 315F-2 PN/DP and as vision sensor evaluation device the VS120 system for the shape check are used. The SIMATIC VS120 components consist of an evaluation device with a sensor head and an LED ring lamp. PROFINET is used for networking between the PLC and the SIMATIC VS120.

Module E12 shows in principle the procedure for the startup, based on a brief example.

.

Prerequisites

To successfully work through Module E12, the following knowledge is assumed:

How to handle Windows

Fundamentals of PLC programming with Step7 (for example, Module A3 ‘Startup’ PLC Programming with STEP7)

Fundamentals of network engineering (for example: Appendix V – Basics of Network Engineering)

TIA Training Document

Page 5 of 47

Module

E12

 

 

Status: 01/2010

Vision Sensor Shape Check with SIMATIC S7-300F 2PN/DP and VS120

Page 5
Image 5
Siemens E12 manual Objective, Prerequisites